Set point
In the construction industry, the term ‘set point’ (or sometimes set-point or setpoint) typically refers to the point at which a building system is set to activate or deactivate.
For example, a heating system might be set to switch on if the internal temperature falls below 20°C, an extract fan might be set to switch on if the relative humidity in a room exceeds 65% and so on.
Set points can be fixed, adjustable or variable. An adjustable set point might be controlled for example by a manually-operated thermostat. A variable set point might be controlled by some form of calculation, for example, set points for air conditioning systems may be programmed to be higher when outdoor temperatures are higher as people are more conditioned to, and dressed for those higher temperatures. Alternatively, if a building is unoccupied, the set point for the heating might be programmed to reduce to just 5°C to prevent pipework from freezing.
The set point at which something is activated may be different from the set point at which it is de-activated. This prevents continually switching on and off if the conditions are very close to the set point.
Set points may be fine-tuned during the commissioning process, and building occupants may be given control of some set points, perhaps within prescribed parameters.
Set points should be monitored, and checked regularly to ensure that they are correctly set and that they are delivering the required result. Seemingly small changes in set points can have a significant impact on performance and energy use. In addition, some building spaces may house critical operations requiring very specific, closely-controlled set points.
It is important therefore that building operators and occupants are provided with an explanation of set points, their operating ranges, and the impact of adjustments on performance and energy use.
NB Guide to Controls (BG 83/2023) written by John Marrow and published by BSRIA in June 2023, defines setpoint as: ‘An adjustable level of a parameter, such as temperature, humidity or pressure, which a control system aims to achieve.’
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.