Simple payback for energy savings
According to approved document L of the building regulations, in relation to the conservation of fuel and power, the term 'simple payback' refers to:
The amount of time it will take to recover an initial investment through energy savings, calculated by dividing the marginal additional cost of implementing an energy efficiency measure by the value of the annual energy savings achieved by that measure taking no account of VAT.
When making this calculation, the following guidance should be used:
- The marginal additional cost is the additional cost (materials and labour) of incorporating, for example, additional insulation, not the whole cost of the work.
- The cost of implementing the measure should be based on prices current at the date the proposals are made known to the building control body (BCB) and be confirmed in a report signed by a suitably qualified person.
- The annual energy savings should be estimated using an energy calculation tool approved by the Secretary of State pursuant to regulation 24.
- For the purposes of the approved document, the energy prices that are current at the time of the application to building control should be used when evaluating the annual energy savings. Current energy prices can be obtained from the Department of Energy & Climate Change (DECC) website.
Typically, an initial investment, in for example the achievement of U-values, will be considered economically feasilbe if the simple payback period is not greater than 15 years. However, other periods may be considered economically feasible for other elements.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.