Specified perils in construction contracts
Construction works involve large amounts of money and are at high risk of damage. As a consequence construction contracts will generally include an obligation to insure:
- The works.
- On-site materials or goods.
- Off-site materials or goods.
- Existing structures and their contents.
This insurance may cover all risks, or may be restricted to certain ‘specified perils.’
Specified perils tend to be significant events that would cause very significant damage, such as fire, explosions, earthquakes, flooding and so on. All-risks insurance will tend to cover a broader range of risks, albeit it may not cover every possible risk.
Policies may be taken out by the contractor or by the client depending on the form of contract and the options selected, and may be for all risks, specified perils, or a combination for different parts of the cover. For example existing structures might be insured against specified perils whilst the construction works might be insured against all risks.
Insurance will generally be in the form of a ‘joint names policy’ in the names of the contractor and the client. This gives both parties their own rights to claim against the insurer. Other parties, such as funders may also be added as a joint name.
Joint-names insurance will generally prevent claims against the co-insured party for an insured loss. Whether or not claims can be made by one party against the other for uninsured losses where one of the parties is at fault will depend on whether the contract permits this or not.
NB See also relevant events.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.