Design life varies according to the type and use of a structure. A structure should retain fitness for purpose as it approaches and passes its design life or changes use.
Much of our small scale built environment was developed without a defined service life. The structure, services and finishes are likely to have been upgraded progressively without disproportionate cost and with limited regulation.
For major public infrastructure and industrial/commercial structures a design life will have been specified in the design brief but changes in loading and use will have often required upgrades long before the design life has been reached. Bridges in particular have an inspection and assessment process in order to evaluate ongoing serviceability. For essential public infrastructure the consequence of closures for replacement is such that life extension, strengthening and upgrade whilst remaining in service may have to take place.
For industrial structures the economic life of the system of which the structure is a part is usually governed by the M&E equipment and the commercial viability of the production system or the resource being exploited.
For many commercial structures the structure itself is likely to have a longer economically viable life than the commercial application. M&E equipment upgrade requirements, changes in technology and changes in use can limit the economic life of a structure. The presence of hazardous materials may limit the economic viability of modifications to older low value structures to meet new commercial needs.
In pure structural terms life extension is greatly facilitated if the structure is accessible for inspection and repair and the design and fabrication information is readily available. BIM will be valuable for future life extension of new structures.
Whilst the focus in structural assessments is on the primary components of a structure consideration of secondary elements such as cladding panels and facades is also necessary because they may fail due to corrosion of fixings and decay of masonry.
Internationally, there is a need for greater awareness and regulation in some countries as there have been many structure failures arising from combinations of poor construction and maintenance and additions beyond the capability of the original structure and foundation.
We need to avoid the largely unnecessary cost and effort associated with calling for design life assessments for all structures. Major structures with inspection and maintenance programmes and those actively managed and maintained are already largely satisfactorily addressed, but would be helped by more design attention to inspection and maintenance. Industrial structures often have a short life but changes in use may not be fully covered. Domestic structures do not need it. Perhaps small scale commercial structures do.
This topic paper was issued by SCOSS in June 2015. You can view the original here.
[edit] Related articles on Designing Buildings Wiki
- Concept structural design of buildings.
- Cradle-to-grave.
- Deflection.
- De la Concorde overpass collapse.
- Decommissioning.
- Demolition.
- Design for deconstruction.
- Design life.
- Design quality for buildings.
- Detailed structural design.
- Dismantling.
- Elements of structure in buildings.
- FC Twente stadium roof collapse.
- Fitness for purpose.
- Major cast metal components.
- Span.
- Structural engineer.
- Structural steelwork.
- Structural vibration.
- Structure definition.
- The development of structural membranes.
- Urban decay.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.