The future of the coronavirus furlough
Contents |
[edit] Introduction
As many people know, the Government has extended the Coronavirus Job Retention Scheme (aka the furlough scheme) until the end of October 2020. Since it was announced in March 2020, this scheme has been a key mechanism for supporting jobs and wages in our industry and the wider construction sector. Indeed, the Construction Leadership Council (CLC) estimates that overall some 84 per cent of the construction sector has used the scheme to furlough workers for multiple months.
[edit] Predictions
Looking ahead, Electrical Contractors' Association (ECA) members working on construction projects expect the proportion of employees still on furlough to diminish, although it is feared that commercial constraints and ongoing issues with social distancing, transport and overnight accommodation may slow this process down. Furthermore, owners and occupiers of existing buildings are proving less able or willing to let electricians and other trades back in, especially in the domestic market – suggesting any recovery here is likely to be less certain and much more drawn out than on construction projects.
As part of the Government’s extension of the scheme, they have confirmed there will be no changes whatsoever until the end of July 2020. The Government is though expected to make changes to the scheme between August and October 2020. It is likely this will involve employers contributing towards the payment of wages, along with the Government, and greater flexibility in the system, including a ‘part-time furlough’ option. More detail will follow on this.
[edit] Report released
For our part, ECA has already been an active member of a Construction Leadership Council (CLC) working group on unfurloughing. The aim of this group was to consider how all parts of the construction supply chain might return employees to work after a period of furlough, in a way that does not lead to mass redundancies or the contraction of the industry’s skills base. This has involved contributing views and observations which helped form a new paper on unfurloughing.
One of the report’s main observations is that the UK faces a cliff edge if the Government does not introduce some form of flexible support for employers who are in a position to provide some work to their employees, but not at the same level or with the same consistency as in more settled times .
By introducing the possibility of part-time furlough only in August 2020, ECA fears that the Government could be providing this flexible support too late for industry employers to make use of it – opening up the possibility of otherwise unnecessary redundancies in the meantime. In responding to the Government’s part-time furlough proposals (expected to be published by the end of May 2020), ECA will also be pressing for eligibility conditions to be broadly defined, covering more than just the situation where someone works fewer days per week: the circumstances in which part-time furlough could prove helpful to our industry are far more diverse than this.
ECA will continue to represent the interests of members and the entire engineering services industry on the CLC’s coronavirus working groups.
The ECA offers more information on furlough and other topics at its business recovery page, available at www.eca.co.uk/business-recovery.
This article was originally published on the ECA blog as ‘The future of furlough’, written by Andrew Eldred, ECA Director of Employment and Skills. It was posted on 19 May 2020.
--ECA
[edit] Related articles on Designing Buildings Wiki
- August 2020 construction PMI survey results.
- Beyond the pandemic.
- Coronavirus.
- Coronavirus impact survey.
- Coronavirus job retention scheme.
- ECA articles.
- ECA Survey: Industry remains optimistic despite downturn.
- Engineering services bodies issue coronavirus site safety guides.
- England housing market resumes operations.
- Furlough.
- January 2021 construction output figures.
- Plan proposes to reinvent construction industry.
- Survey records business projections after coronavirus storm.
- Winter Support 2020 - 2021 packages for businesses.
[edit] External resource
- Back to Work - The Construction Industry’s Proposals for the Future of the Coronavirus Job Retention Scheme. (This is a downloadable PDF.)
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.