Waste water treatment research in Alborz
Contents |
[edit] Introduction
The following abstract reviews the industrial waste water process that may be used for the treatment and purification of waste water that has become contaminated as a result of industry production lines creating an undesirable by product.
After treatment, the effluent - the treated or untreated waste water - might be released to a sanitary canal or sewer or even to the surface water in the environment. Recent actions have been taken to prevent or minimise such production or to reuse purified wastewater within the manufacturing lines.
[edit] Research
The objective of this research was to investigate issues and obstacles of a waste water treatment plant during the process of its preparation, establishment and maintenance in industrial city of Alborz, Iran. This research aimed to reveal the most effective factors in the process of the environmental management project to minimise or diminish negative consequences and consider the effectiveness of those factors.
To conduct the research, a descriptive method was used to collect data. A questionnaire was used during an approved interview process. The distributed questionnaires were completed by employees who worked in industrial factories in Alborz. Grounded research theory (applicable for the project management system), Likert scales, Comparative Scaling Technique and Rank Order Scaling were used to develop the questionnaire.
[edit] Findings
The findings of the study indicated that out of 306 factories, 223 of which responded, only 160 currently have established wastewater treatment plants. Of those who responded, 37% noted that ‘Governmental obligation or national regulation’ has been the most effective factor in prompting them to establish a treatment plant; without that, they would not have been worried about the necessity or the environment.
Moreover, 25% identified financial deficits and concerns over future difficulties (such as unpredicted costs) while 22% identified maintenance. Inaccurate budgets (27%) and safety issues (30%) were common responses; 39% stated costly procedures (including equipment and controlling devices and staff) as the primary obstacles.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.