Accident reports in construction
There is a legal requirement through the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013 (RIDDOR) for accidents and incidents to be reported to the Health and Safety Executive (HSE).
While RIDDOR recommends that all accidents, however small, are recorded in an accident book, it identifies the more serious types of accidents which must be reported to HSE as well as being recorded in the book. These include:
- Any injury that stops an employee doing their normal work for a period of 3 days or more.
- Major injuries such as broken arms, ribs, legs, etc.
- Fatalities.
- Disease.
- Dangerous instances occurring at work such as machinery breaking, scaffolding collapsing or any other appliances breaking and causing damage.
Forme can be found here for the following incidents:
- Injury.
- Dangerous occurrence.
- Injury offshore.
- Dangerous occurrence offshore.
- Case of disease.
- Flammable gas incident.
- Dangerous gas fitting.
The appropriate form should be completed by the responsible person. Fatalities and major injuries can be reported by phone to the HSE. A report must be received within 10 days of the incident.
The following information should be recorded:
- Injured person’s personal and contact details (name, phone number, address, age, occupation, etc.).
- Reporter’s personal and contact details (name, position, phone number, address, etc.).
- Accident details (date, time, location).
- Injury details (type, body part, whether any work days were lost as a result, whether an ambulance was required, whether the injured person lost consciousness, etc.).
- Witness details (name, phone number, address, etc.).
- Details of any supporting evidence (e.g. CCTV footage, photographs, training records, health and safety check records, cleaning logs, etc.).
- Reasons for accident (how it occurred, working conditions at the time, PPE being worn, equipment being used, events leading up to accident, etc.).
- Response to accident (first aid provided, whether the area was made safe, direct action).
- Preventative action (training needs, preventative plan put in place, how recurrences will be prevented).
[edit] Related articles on Designing Buildings
- Accident book.
- Construction health risks.
- Health and safety file.
- Injuries on construction sites.
- Near miss.
- Notification to HSE.
- Occupational accident.
- Occupational injury.
- Reporting accidents and injuries on construction sites RIDDOR.
- Safety audit.
- Site records and registers.
- Slip and trip hazards.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.