Director’s adjustment
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS). They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects.
According to NRM2: Detailed measurement for building works, a director’s adjustment is:
…a reduction or addition to the tender price, derived by the contractor’s estimating team, offered by the director(s) of the contractor. |
The contractor’s directors, or other senior managers, will typically perform a commercial review of the estimated price with a view to how best to secure work. They may then decide to adjust to the estimated price, taking into consideration the need to secure work, the level of competition in the market, the company’s cash flow, financing charges and so on.
This will be identified as a separate line in the bill of quantities, where the contractor can insert their adjustment.
[edit] Related articles on Designing Buildings Wiki
- Approximate bill of quantities.
- Bill of quantities breakdown structures.
- Bill of quantities.
- Elemental bill of quantities.
- Firm bill of quantities.
- Measurement.
- NRM2.
- Tender documentation.
- Tender pricing document.
- Types of bill of quantities.
- Work package bill of quantities.
- Work section bill of quantities.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.