Payback period
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS). They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects.
NRM3: Order of cost estimating and cost planning for building maintenance works, suggests that the ‘payback period’ (PB) is:
…the measure of how long it takes to recover initial investment costs and is a useful basis for evaluating alternative investment options. It may be calculated using either real (non-discounted) values for future costs, that is ‘Simple PB’, or present (discounted) values, that is ‘Discounted PB’. PB in general ignores all costs and savings after the payback point has been reached and it is possible that an investment with a short PB is a poorer option than one with a longer payback over the entire period of analysis. PB is a useful technique for assessing whether additional investment in, for example, lower energy plant, is worthwhile. It enables users to weigh the additional capital costs against the time it takes for these costs to be recouped through savings or income during the operational period. This may be a useful means of judging whether an investment represents good value for money, although the subjective nature of the value for money assessment may make it in appropriate for some public sector investment decisions. |
See also: Economically feasible.
[edit] Related articles on Designing Buildings
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.