NRM3
The New Rules of Measurement (NRM) are published by the Royal Institute of Chartered Surveyors (RICS), prepared by the Quantity Surveying and Construction Professional Group. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects. Adopting a standard methodology such as NRM facilitates consistency and benchmarking and helps avoid disputes.
NRM is a suite of documents, comprising three volumes:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works (replacing the Standard Method of Measurement, seventh edition SMM7).
- NRM 3: Order of cost estimating and cost planning for building maintenance works.
Together this suite of documents offers a cradle-to-grave approach to cost estimating, works procurement and post-construction procurement.
NRM 3 is intended to provide a consistent method for the quantification and description of maintenance works. It was published in March 2014 and is available from the RICS website.
NRM3 can be used for:
- Initial order of cost estimates during preparation stages.
- Cost plans during the design development and pre-construction stages.
- Asset-specific cost plans during the pre-construction phases.
It also offers guidance about:
- The procurement and cost control of maintenance works.
- The measurement of other items associated with maintenance works that are not included in work items.
The rules for NRM3 follow the same framework and premise as NRM1: Order of cost estimating and cost planning for capital building works.
NB The New Rules of Measurement are accompanied by the 'Black Book', the QS and construction standards. Together they provide a suite of tools that will help the construction industry work more collaboratively and consistently.
[edit] Related articles on Designing Buildings Wiki
- Bill of quantities.
- Common Arrangement of Work Sections (CAWS).
- Comparison of SMM7 with NRM2.
- Cost plans.
- External works.
- Measurement.
- New Rules of Measurement.
- NRM1.
- NRM2.
- Schedule of work.
- Standard Method of Measurement (SMM7).
- Tender.
- Tender documentation.
- Uniclass.
[edit] External references
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.
Comments
err... WHERE is it?
http://www.rics.org/uk/shop/NRM-3-Order-of-cost-estimating-and-cost-planning-for-building-maintenance-works-19866.aspx