Expo 2020 Dubai
Expo 2020 Dubai, Dubai, United Arab Emirates Client: Dubai Expo 2020 Project Management Consultant: Turner & Townsend, UAE: Peter Day Senior Project Manager Project Role: Seconded into the Dubai Expo 2020 to provide in-house project management services. Primarily leading and coordinating a multi-disciplinary team from across the globe to deliver a number of confidential pavilions and front of house event architecture. |
Contents |
Overview
The World Expo is a global gathering of nations designed to find solutions to pressing challenges of our times. In 2020-2021, the event was scheduled to take place in Dubai from October 2020 - March 2021. Due to the COVID-19 pandemic, the opening was postponed to 1 October 2021.
Event project management
For mainstream and event construction project management, both types of projects require a clearly defined brief, robust project plan, shared success criteria and best practice project management tools and techniques. However, there are some differences in event construction project management processes compared to non-event construction project management.
The event industry differs from the open construction market primarily due to the impermanent nature of the built assets in event construction. Due to this, the responsibilities for the design, installation, maintenance and removal of all scope associated with the built asset tends to fall on the contractor (rather than the typical collection of different organisations and teams). This leads to differences in the way projects are procured, designed and delivered.
There are also subtle contractual differences. While the FIDIC suite of contracts are used in both instances, the transfer of title (and specifically the contractor’s materials and facilities) are often procured on a rental basis in event construction; title of materials and assets does not transfer to the client. This is due to the buildings and infrastructure being constructed on a temporary basis with the contractor’s scope extending into post-handover maintenance and post event removal.
There are also differences in procurement. The Middle East construction market typically favours a traditional procurement practice (full client design competitively tendered and awarded for the lowest price), which may lead to an adversarial environment. Conversely, the event industry uses more collaborative procurement methods such as design and build construction contracts and consultant framework agreements.
Dubai Expo 2020 has successfully adopted these collaborative principles which can be seen by contract sums and payment milestones being set early in the design process. Also, there are strong examples of integrated client, contractor and design teams all formally engaged to work collaboratively throughout the design and delivery process.
Final thoughts
General construction project management strategies such as formally engaging in commercial transparency and team collaboration early on in the delivery process provide projects and team members with the best chance of success across every type of construction project. However, it important to recognise that within each type of construction project there are subtle differences. It is important to be aware of them, be flexible and be adaptable to each individual project in order to succeed.
--ICPMA 09:57, 16 Feb 2021 (BST)
Related articles on Designing Buildings Wiki
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.