Part 36 offer
A Part 36 Offer is a written offer to settle a dispute, specifying a period of not less than 21 days (‘the Relevant Period’) during which it can be accepted. If it is not accepted within the Relevant Period and the other party does not beat that offer then there will be costs consequences. They are a tactical incentive for parties to settle disputes without a court trial and can be claimant or defendant driven and at any stage in civil proceedings.
The Civil Procedure Rules (CPR), which were updated lin 2022, prescribes the criteria which must be met to satisfy being a Part 36 offer, and to ensure the costs consequences are applicable.
It must:
- Be in writing.
- Clarify that it is being made pursuant to Part 36.
- Specify a period of not less than 21 days within which the defendant will be liable for the claimant’s costs in accordance with rule 36.13 or 36.20 if the offer is not accepted (the Relevant Period); and
- State whether it relates to the whole claim or part of it and state whether it takes into account any counterclaim.
- Since 2021 'A Part 36 offer to accept a sum of money may make provision for accrual of interest on such sum after the date specified in paragraph. If such an offer does not make any such provision, it shall be treated as inclusive of all interest up to the date of acceptance if it is later accepted”.
An alternative is a Calderbank offer, also known as a “without prejudice save as to costs” offer.
[edit] Related articles on Designing Buildings
- Adjudication.
- Alternative dispute resolution.
- Arbitration Act.
- Arbitration panel.
- Arbitration v Adjudication.
- Arbitration in the construction industry
- Calderbank offer.
- Causes of construction disputes.
- Conciliation.
- Contract claims.
- Dispute resolution.
- Mediation.
- Pay now argue later.
- Pendulum arbitration.
- Provisional relief.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.