Post occupancy evaluation process
BREEAM UK New Construction, Non-domestic Buildings (United Kingdom), Technical Manual, SD5078: BREEAM UK New Construction 2018 3.0, published by BRE Global Limited, defines Post-Occupancy Evaluation (POE), also known as Building Performance Evaluation (BPE) as a process:
….used to improve the building operation, occupants' comfort and other areas based on its outcomes. Therefore, the POE provides suggestions on potential improvements, including, but not limited to the following:
A POE can also be used as part of the stakeholder consultation at the briefing stage for a new building or the refurbishment of an existing one, in cases where the building occupants are the same. This can be achieved through the use of a questionnaire or workshops to highlight lessons from the old or existing building that could be taken into account in the design of the new project. |
In relation to POE methodologies, it says:
‘Any POE or BPE methodology that fulfils the criteria can be used. Further guidance on POE can be found in the following resources:
- BCO guide to Post-Occupancy Evaluation, British Council for Offices (BCO), 2007
- BRE’s Design Quality Method (DQM) is a tried and tested, independent, post occupancy evaluation (POE) method used by all UK auditing authorities, and many funding bodies. Further information can be found at http://www.bregroup.com
- BRE Digest 478, Building performance feedback: getting started
- Guide to Post Occupancy Evaluation: Report and Toolkit
- The Building Use Studies (BUS) methodology is an occupant satisfaction survey that will fulfil part of the POE credit requirement, occupant feedback stage: https://busmethodology.org.uk/
- The Design Quality Indicator (DQI) is a method to assess the design quality of buildings. DQI is a process that actively involves a wide group of stakeholders in the design of building. It is delivered though a facilitated workshop that enables representatives from both the demand and supply side to work together to achieve the best outcome. Completion of the DQI Stage 5, In-use stage workshop could fulfil part of the POE credit requirement, the occupant feedback stage. See http://www.dqi.org.uk.
- BSRIA Guide to Building Performance Evaluation in Non-Domestic Buildings is a general introduction to BPE, and explains why it is important and how it can be carried out.
[edit] Related articles on Designing Buildings Wiki
- Advantages of shell and core.
- Appointing consultants.
- BRE articles.
- BREEAM Post occupancy evaluation.
- BREEAM.
- Building performance evaluation in non-domestic buildings guide – an introduction to the tests and methods in non-domestic buildings
- Building performance evaluation.
- Building Research Establishment.
- Building Use Studies.
- Design quality indicator DQI.
- Extended aftercare.
- Initial aftercare.
- Performance gap.
- Performance in use.
- Post occupancy evaluation.
- Post project review.
- Soft landings.
Featured articles and news
Infrastructure that connect the physical and digital domains.
Harnessing robotics and AI in challenging environments
The key to nuclear decommissioning and fusion engineering.
BSRIA announces Lisa Ashworth as new CEO
Tasked with furthering BSRIA’s impressive growth ambitions.
Public buildings get half a million energy efficiency boost
£557 million to switch to cleaner heating and save on energy.
CIOB launches pre-election manifesto
Outlining potential future policies for the next government.
Grenfell Tower Inquiry announcement
Phase 2 hearings come to a close and the final report due in September.
Progress from Parts L, F and O: A whitepaper, one year on.
A replicated study to understand the opinion of practitioners.
ECA announces new president 2024
Electrical engineer and business leader Stuart Smith.
A distinct type of countryside that should be celebrated.
Should Part O be extended to existing buildings?
EAC brands heatwave adaptation a missed opportunity.
Definition of Statutory in workplace and facilities management
Established by IWFM, BESA, CIBSE and BSRIA.
Tackling the transition from traditional heating systems
59% lack the necessary information and confidence to switch.
The general election and the construction industry
As PM, Rishi Sunak announces July 4 date for an election.
Eco apprenticeships continue help grow green workforce
A year after being recognised at the King's coronation.
Permitted development rights for agricultural buildings
The changes coming into effect as of May 21, 2024.